Update #3 19-20
- dvhsunderwaterrobotics
- Dec 11, 2019
- 1 min read
Hello!
Welcome back yet again to our website,
These past 2 weeks we've been working on reconstructing the sub after the ground wire snap during testing.

Another thing we soldered is on power connector for the sub to make sure that it did not snap during further testing.

As well as brainstorming new claw designs using past DVHS's teams ideas that they dropped.

At this point in time not a lot of major things are happening but that does not stop us from working or designing. The next major thing happening is preparing to test over the winter break.
Have a wonderful day,
-Head of logistics
Zoë Hyland-Agee
Comentarios